Types of estimating
In its broadest sense, the term ‘estimating’ is the process of quantify something. In the construction industry, it is typically used in relation to determining the approximate costs associated with a construction project, used, for example to assess the viability or affordability of the project or aspects of it.
Types of estimating include:
- Analogous estimating.
- Bay method.
- Benchmarking.
- Bottom-up estimation.
- Cost plans.
- Elemental estimating.
- Expert opinion estimating.
- Operational rate estimate.
- Order of cost estimating.
- Parametric estimating.
- Post tender estimate.
- Pre-tender estimate.
- Three point estimation.
- Top down estimating.
- Unit rate estimating.
[edit] Related articles on Designing Buildings
Featured articles
Check out some of the best features and news from Designing Buildings as well as key stories from around the web.
Introduction to radon awareness
New technical information sheet published by CIOB.
Updated supplier guide can help electrical contractors engage with NHP.
CIAT confirm the winners of the 2026 architectural technology awards.
Government launches a one stop shop for flood preparedness.
Sir Edwin Lutyens: Britain's greatest architect? Book review.
CIOB publishes free template to help assess and manage risks.
ECA's reflections on Party Conference season
Burnham wants to be confident of winning before asking for a fresh mandate.
New Chief Construction and Scientific Adviser
Sergio Cavalaro, Professor of Infrastructure Systems at Loughborough University.
Building safety levy for England
CIAT publish estimator tool for members.
Water sector faces a growing crisis that could slow the delivery of vital infrastructure.
Undervaluing our industrial past
Heritage value changes as taste for building styles changes.
Changing expectations around competence and compliance
New information sheet from CIAT.